| Location | Date | Summary | |
|---|---|---|---|
| Hope Hall, Shropshire. | November 2009 | This installation was completed at a rural location in Shropshire, where the 3kW turbine was installed on a 15m mast... | more |
| Kingsbridge, Devon | July 2009 | The Kingsbridge installation consists of two 3kW turbines, each connected to a separate phase on the property's 3 phase supply. | more |
| Kenmare, Co Kerry, Ireland | May 2009 | The VWE 3kW turbine was installed in May 2009 on a 10m mast approximately 50m from the house. | more |
| Bombardier Aerospace in Belfast | September 2008 | Bombardier Aerospace in Belfast has installed a Vertical Wind Energy 3KW turbine as a beta-test site. | more |
| Myres Hill, East Kilbride | February 2008 | VWE Ltd has recently installed a fully functional Vertical Axis Turbine at the site. The 3Kw turbine is currently being tested on a 9m high hinged mast. | more |